Case Study
Modern Industrial Campus
Metro Development Group
The Challenge
Panel sequencing across multiple structures with shared crane windows.
The Scope
Multi-building tilt-up panels up to 8,000 sq ft
The Solution
Integrated lift schedule with GC trades and pre-pour mock-up approval.
Key Achievements
Panel placement finished ahead of enclosure milestone.